Right now we're working through the various permitting required by Environmental Health - Field run topographic survey showing 2' elevation changes, Level III work on additional 3 acres of adjacent lot, etc.

The goal is to improve the septic and drainfield capacity for the Church. County and state requirements are based on PEAK versus AVERAGE capacity in the way of church occupancy. Having the site plan engineered will allow us to show these additional items. Once this is done, hopefully our building plans will be engineered and we'll be ready to start construction.